MARTIN were main contractor on a scheme in 2019 to install an interceptor at the Premier Foods production facility on the Apollo Road in Belfast. The bread production facility operates 24 hours a day, seven days a week therefore MARTIN established a pedestrian and vehicle management system to ensure there was no disruption to the factory operations.
Installation involved; bulk excavation of contaminated ground (150m3), with waste disposed to an NIEA approved facility; temporary works for the sheet piling and chamber installation; removal of existing chamber and drainage runs; installation of Kingspan W2/150-W2/190 Wash Down and Silt Separator; alteration to the live pipework inlet and outlet, manholes and sampling chamber; alarm probe connected to a monitoring station; connection to the existing water course including pre-cast head wall; alterations including kerbing and blacktop to carriageway and footway; soft landscaping reinstatement.
MARTIN are proud to have become a Constructionline gold member, highlighting their commitment to quality and industry best practice
MARTIN are delighted that the flagship Cathedral Gardens project is open to the public in Belfast City Centre. This amazing shared city space, created […]
MARTIN are extremely proud to have been able to facilitate Belfast City Centre projections in support of our NHS and key workers from our […]